Solar DHW Quote, good or not good?
- elephant
- Econologue expert
- posts: 6646
- Registration: 28/07/06, 21:25
- Location: Charleroi, center of the world ....
- x 7
No, it is quite feasible: many workers earn a net net of 1250-1400 euros / month (taxes paid).
0 x
elephant Supreme Honorary éconologue PCQ ..... I'm too cautious, not rich enough and too lazy to really save the CO2! http://www.caroloo.be
- Woodcutter
- Econologue expert
- posts: 4731
- Registration: 07/11/05, 10:45
- Location: Mountain ... (Trièves)
- x 2
-
- Moderator
- posts: 79386
- Registration: 10/02/03, 14:06
- Location: Greenhouse planet
- x 11074
Woodcutter wrote:Elephant, at 30 € MO, you pay them under the SMIC your employees?
Yes to the black smic
Without laughing: in Belgium it's not the same, we take taxes on income from wages, on your payslip: it therefore hurts a little less (at least you feel it less if you don't look at your pays in detail) and therefore the difference between gross and net is more important ...
Contrary to the myth created by "Johnny", Belgium is one of the countries in Europe where the work of the "lower and middle classes" is the most heavily taxed: more than in France!
0 x
Do a image search or an text search - Netiquette of forum
The CESI quotation that I retained includes:
- 2 panels SCHUCO Premium SolDG. either 5m² of sensors.
- A 300 double liter exchanger (the gas boiler will supply the top exchanger) with sanitary regulator.
- supply + installation + VAT 5.5
TOTAL 4.250 € TTC
The panels will be integrated into the roof and photovoltaic panel fields to which they agree dimensionally and visually.
Considering the specifics (high-end material, particular assembly ...), I find this price "acceptable".
This site gives right to a tax credit of 1750 € approximately ...
It comes back with the price of the material not assembled in DIY superstores ... without accessories, commissioning, warranty ...
My installer is a discreet company that has been established for more than 30 years (my parents were customers), he masters all the trades necessary for this project and has all the approvals qualisol, qualiPV, Qualigaz ...
Finally, the more I peel my quote and compare it to your arguments, the more I am comforted in my choice.
- 2 panels SCHUCO Premium SolDG. either 5m² of sensors.
- A 300 double liter exchanger (the gas boiler will supply the top exchanger) with sanitary regulator.
- supply + installation + VAT 5.5
TOTAL 4.250 € TTC
The panels will be integrated into the roof and photovoltaic panel fields to which they agree dimensionally and visually.
Considering the specifics (high-end material, particular assembly ...), I find this price "acceptable".
This site gives right to a tax credit of 1750 € approximately ...
It comes back with the price of the material not assembled in DIY superstores ... without accessories, commissioning, warranty ...
My installer is a discreet company that has been established for more than 30 years (my parents were customers), he masters all the trades necessary for this project and has all the approvals qualisol, qualiPV, Qualigaz ...
Finally, the more I peel my quote and compare it to your arguments, the more I am comforted in my choice.
0 x
citro wrote:The CESI quotation that I retained includes:
- 2 panels SCHUCO Premium SolDG. either 5m² of sensors.
- A 300 double liter exchanger (the gas boiler will supply the top exchanger) with sanitary regulator.
- supply + installation + VAT 5.5
TOTAL 4.250 € TTC
The panels will be integrated into the roof and photovoltaic panel fields to which they agree dimensionally and visually.
Considering the specifics (high-end material, particular assembly ...), I find this price "acceptable".
This site gives right to a tax credit of 1750 € approximately ...
It comes back with the price of the material not assembled in DIY superstores ... without accessories, commissioning, warranty ...
My installer is a discreet company that has been established for more than 30 years (my parents were customers), he masters all the trades necessary for this project and has all the approvals qualisol, qualiPV, Qualigaz ...
Finally, the more I peel my quote and compare it to your arguments, the more I am comforted in my choice.
You got a very good price your installer does not come into the 77 ??? it interests me greatly?
Alex
0 x
-
- Moderator
- posts: 79386
- Registration: 10/02/03, 14:06
- Location: Greenhouse planet
- x 11074
It's not a very good price, it's a fair price.
5m² and a balloon of 300L posed ca not worth more than that ... after it depends on the MO ie the specificity of each site (access to the roof for example ...).
So I think, a fair price! Citro you can say yes I think ... you will hardly find better ...
5m² and a balloon of 300L posed ca not worth more than that ... after it depends on the MO ie the specificity of each site (access to the roof for example ...).
So I think, a fair price! Citro you can say yes I think ... you will hardly find better ...
0 x
Do a image search or an text search - Netiquette of forum
-
- Moderator
- posts: 79386
- Registration: 10/02/03, 14:06
- Location: Greenhouse planet
- x 11074
Ben can be that the configuration of your house is much more delicate than that of Citro I do not know ...
You can always ask Citro to make a copy of the quote and put it in front of you.
It's a good way to negotiate.
You can always ask Citro to make a copy of the quote and put it in front of you.
It's a good way to negotiate.
0 x
Do a image search or an text search - Netiquette of forum
-
- Moderator
- posts: 79386
- Registration: 10/02/03, 14:06
- Location: Greenhouse planet
- x 11074
Actually it seems to me easy to roof, to see where is located the rest of your installation / South Pan.
ps: I deleted your email (best way to be spam), send him an MP by clicking on MP at the bottom of one of his messages ...
ps: I deleted your email (best way to be spam), send him an MP by clicking on MP at the bottom of one of his messages ...
0 x
Do a image search or an text search - Netiquette of forum
-
- Similar topics
- Replies
- views
- Last message
-
- 6 Replies
- 22129 views
-
Last message by dedeleco
View the latest post
01/09/11, 00:13A subject posted in the forum : Real estate and eco-construction: diagnostics, HQE, HPE, bioclimatism, natural habitat and climatic architecture
-
- 35 Replies
- 79762 views
-
Last message by sertop
View the latest post
30/01/13, 00:35A subject posted in the forum : Real estate and eco-construction: diagnostics, HQE, HPE, bioclimatism, natural habitat and climatic architecture
-
- 3 Replies
- 22959 views
-
Last message by Louange7575
View the latest post
02/08/11, 21:01A subject posted in the forum : Real estate and eco-construction: diagnostics, HQE, HPE, bioclimatism, natural habitat and climatic architecture
-
- 0 Replies
- 18603 views
-
Last message by owen
View the latest post
17/02/10, 00:22A subject posted in the forum : Real estate and eco-construction: diagnostics, HQE, HPE, bioclimatism, natural habitat and climatic architecture
-
- 15 Replies
- 33244 views
-
Last message by elephant
View the latest post
02/02/10, 09:31A subject posted in the forum : Real estate and eco-construction: diagnostics, HQE, HPE, bioclimatism, natural habitat and climatic architecture
Who is online ?
Users browsing this forum : No registered users and 104 guests