Search found 3 results

by mill geus
19/05/20, 15:57
Forum : Hydraulic, wind, geothermal, marine energy, biogas ...
Subject : Hydroelectric engineering
answers: 4
views: 5206

Re: Hydroelectric engineering

Hello, Thank you for this encouraging information ... the 700 l / s is the maximum authorized flow rate of water withdrawal (limited by a stone giving the level). In practice, the river is able to provide this flow all year round without being too affected. However, in summer, in the dry period (summer), it f ...
by mill geus
12/05/20, 19:49
Forum : Hydraulic, wind, geothermal, marine energy, biogas ...
Subject : Hydroelectric engineering
answers: 4
views: 5206

Re: hydroelectric engineering

Thank you for the information .
I have already contacted Turbiwatt but no response (probably in recovery after Covid).
I will contact the Moulins de France.
good night
by mill geus
12/05/20, 19:15
Forum : Hydraulic, wind, geothermal, marine energy, biogas ...
Subject : Hydroelectric engineering
answers: 4
views: 5206

Hydroelectric engineering

Hello, I have just bought an old mill in the Béarn and I would like to build an installation to produce electricity for my use and to resell the excess. I have a waterfall of 2.4 m and a flow rate of 700l / s. Does anyone know of a firm capable of helping me. Field of ...