photovoltaic redemption price




by bobono » 18/01/10, 10:12

Pricing at 1er January 2010:

What will penalize small businesses the most is the new condition of integration is even a killing.

The solar panel must be a slate air will not pass from below (not good). If you remove the panel it must not have any sealing.


The 12 January 2010, the decree is presented (registration in the JO 14 / 01 / 2010.NOR: DEVE0930803A.
The order presents a large number of amendments, improvements, clarifications to current legislation.

The prices go from 2 possibilities to 4, as well in metropolises as in Dom Tom & Corsica.

IB Rate (Building Integration)
Value: 0,58 € / KWh or 0.50 € / KWh product
Always the limitation of 1500h.

Price 0.58 € / KWh - Obligation to answer 3 mandatory criteria:

• Installation of the power plant on the roof of a building for residential use, education and / or health completely closed (4 sides)
• Installation of the central replacing one or more elements of the building ensuring the closed or the cover and the Installation must be IN the plan roof.
o In summary: to meet this obligation, it is necessary that if one removes the solar installation, the building loses one of the concepts of closed and covered.
o The solution to put a protection seal under solar collectors is no longer feasible
• For rigid modules, the latter must seal
o All integration systems currently in steel tray, PVtec, Intersole and similar no longer fall within IB criteria.
• For flexible membrane solutions, the cell / sealing assembly must be done at the factory or on site (provided that only a single works contract is provided).
o It seems that we need to define precisely what a single works contract means

Price 0.50 € / KWh - Obligation to answer 4 mandatory criteria:

• Installation of the power plant on the roof of a completely enclosed building (4 sides)
• Installation of the central replacing one or more elements of the building ensuring the closed or the cover and the Installation must be IN the plan roof.
o In summary: to meet this obligation, it is necessary that if one removes the solar installation, the building loses one of the concepts of closed and covered.
o The solution to put a protection seal under solar collectors is no longer feasible
• For rigid modules, the latter must seal
o All integration systems currently in steel tray, PVtec, Intersole and similar no longer fall within IB criteria.
• For flexible membrane solutions, the cell / sealing assembly must be done at the factory or on site (provided that only a single works contract is provided).
o It seems that we need to define precisely what a single works contract means

In order to allow a market adaptation to the present obligations, projects benefiting from an AOA contract application made before the December 31 2010 may benefit from the 2009 conditions. This is on the condition that the installation complies with at least the following 3 conditions:
• Replacement of one or more elements ensuring the closed and the cover.
• Building construction completed since + 2 years for non-residential buildings
• Installation parallel to the roof plan

Other solutions exist (cladding for example), but they will not be studied here; this in a spirit of simplification.

Summary :

• Projects that have had a DCC request (Contract) after the January 1 2010er must adhere to the previous rules. After that date, new prospecting and financing criteria (profitability criteria) will have to be validated to continue the development of rooftop rental projects.
• Buildings must be built since + 2 years (exit new or recent projects)
• The buildings must be closed AND covered (exit the projects of agricultural sheds)
• One question remains: the validity of the DCC application is governed by the provision, at the same time, of the elements specified in the technical reference documentation of the public grid operator to which the installation is connected. What are these elements?
• Installations must be made with waterproof modules. Thus, to date, only the solution of tiles (real tiles, simulation of tile type solrif) are eligible for the tariff IB. This poses a security question. Indeed, many concerns of seals have occurred on the installations made with this technique (mécosun, schuco, biohaus, etc.). The question is: is the risk in balance with the expected benefits? SEE FILE TUILES

ISB Price (Simplified Integration on Construction)

Value: 0,42 € / KWh product.
Always the limitation of 1500h.
Obligation to meet the following criteria:

• Installation positioned on the roof of a building ensuring the protection of property, people, animals and activities and if it replaces elements of the building that provide the enclosed and covered, provides the sealing function and if it is parallel to the roof.
o This implies that it is impossible to use Solyndra type solutions, superimposition with or without modification of slope, roof orientation, as well as the solution of roof trackers.
o This implies an impossibility to build a building without use below (no activity, no goods, no people or animals)
• Peak installation power greater than 3 kWp.
• Peak installation power lower than 3 kWp from 2011 if and only if building completion since + 2ans.

Summary :
• Creation of a new intermediate fare between ground floor and IB facilities tariffs. The definition of the ISB is quite restrictive: compulsory sealing, closed and covered building. Here, no notion of complete closure of the building as for the tariff IB.
• We will find in ISB, the following projects in development:
o All building projects not completely enclosed (barns open on 1 or several sides)
• The Solyndra solution is here invalidated (placed on a roof of a building)
• The greenhouse solution is possible here.
• The solution of the shade houses is impossible here (no concept of closed)
• from 2011, installations lower than 3KWc if and only if the building is built from + 2ans

Sol Rate

Value: 0,314 € / KWh multiplied by a departmental coefficient (see Stopped). 40 cts in the islands.

The limitation of 1500h still exists, but in the case of a solar installation placed on Trackers, this limit goes to 2200h

a departmental coefficient R, is created for ground installations exceeding 250kWc; the price is then 31,4 cts x R.

Attachments

Here are some changes compared to the 2009 bonds, important for the risks taken:
• AOA rate blocking changes from 36 to 24 months. This implies that when the purchase contract is requested, the investor will only have 24 months to effectively connect his installation to the network (attention for ground projects, especially because of the risk of administrative recourse extending the deadlines for authorization) in case of overrun, there is no cancellation of contract, but a reduction of as much of the duration of the contract of sale of production.

• These rates are maintained until 31 December 2011 for ISB and 31 December 2012 for IB. After, a haircut of 10% will be applied per year started beyond this date (the discount of 10% applies to the previous year's rate and not by multiplying 10% by the number of years exceeding the deadline)
• The installer must now issue an attestation that the equipment used complies with the DTU in force on the installation (with the corresponding list). This has a strong implication in terms of decennial, since the installer will not be able to make an installation without the manufacturer providing an Atec, a Pass Innov or the investor does not make an Atex for the site in question.
• The coefficient L for annual updating of projects in production still exists, but it is modified:
o The departure indices are the last known indices at the inception of the contract (start-up production).
o The annual indices are no longer the last known indexes on the anniversary date, but the last known indexes at the 1er November preceding the anniversary date.
• Differences in pricing between the city and Dom-Tom disappears for roofs. Only the difference of producible remains (1800-2600 hours instead of 1500-2200 hours in metropolis

In addition to this, a huge question is created by the creation of a repeal of the decree of July 2006: What about the projects having made the steps in 2009 (so normally under tariff 2009) but whose commissioning has not been effective; as well as those whose commissioning is effective, but therefore the contract has not yet been signed ...
0 x
MartinMillot
I discovered econologic
I discovered econologic
posts: 4
Registration: 18/01/10, 23:24

outline of the 2010 decree




by MartinMillot » 18/01/10, 23:59

OA requests are valid until the evening of 11 01 2009,
it's indicated on the decree.


Here is my summary of the main points to remember compared to the former:


The date of the complete application for connection to the public network by the producer determines the rates applicable to an installation.

The complete application must contain all the following elements (article 2 of the decree):

Place, department and region or local authority of the installation
+ Nature of the installation (installation benefiting from the building integration bonus, installation benefiting from the integration bonus simplified to the building or other installation)
+ Nature of operation: surplus sale or sale in full
+ Total peak power installed for photovoltaic generators as defined by NF standards
EN 61215 and NF EN 61646 or maximum electrical power installed in other cases. The power
total installed peak can not be less than the installed power as defined in Article 1er of the decree
2000-877 of the 7 September 2000 abovementioned
+ Delivery voltage.
as well as the elements specified in the technical reference documentation of the public grid operator to which the installation is connected.

The purchase contract is concluded for a period of 20 years from the commissioning of the installation. This bringing into use must take place within a period of 24 months from the date of the complete request for connection to the public network by the producer. If this period is exceeded, the duration of the purchase contract is reduced accordingly.

Contractualisation of the annual indexation of the purchase tariff, to 10% on the evolution of the labor cost + 10% on the evolution of the index of the prices of the production by the application of the coefficient L defined hereafter :
L = 0,8 + 0,1 (ICHTrev-TS / ICHTrev-TS0) + 0,1 (FM0ABE0000 / FM0ABE00000)
with:
ICHTrev-TS is the last known final value at the November 1er preceding the anniversary date of
the effective date of the purchase contract for the revised hourly labor cost index (all employees) in the
mechanical and electrical industries;
FM0ABE0000 is the last known definitive value at the November 1er preceding the anniversary of the inception of the purchase contract of the French industry producer price index for the French market - all of the industry - A10 BE - ex-works price;
ICHTrev-TS0 and FM0ABE00000 are the last known final values ​​at the effective date
purchase contract.

My summary on the purchase obligation tariffs


Right to the 58 integration bonus c € / kWh:

If main use building of new and old dwelling
(within the meaning of Article L. 631-7 of the Code of Construction and Housing)
or educational or health buildings completed for more than
+ The building is closed on all sides and covered
+ The photovoltaic system is installed in the plane of the roof.
+ The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.
+ After installation, the disassembly of the photovoltaic module or the photovoltaic film can not be done without damaging the sealing function provided by the photovoltaic system or making the building unfit for use.
+ For photovoltaic systems composed of rigid modules, the modules constitute
the main sealing element of the system.
+ For photovoltaic systems composed of flexible films, assembly is done at the factory
or on site. On-site assembly is carried out under a single works contract.

ou

If main use building of new and old dwelling
or educational or health buildings completed for more than
+ The photovoltaic system which consists of rigid modules
+ the producer makes the complete request for connection to the public network in accordance with article 2 of this decree before the 1er January 2011 is eligible for the building integration premium
+ The photovoltaic system is installed on the roof of a closed building (on all sides
lateral) and covered, ensuring the protection of persons, animals, property or activities.
+ The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.
+ The installation is parallel to the roof plan.

or even

If the PV installation acts as a light, siding, sunshade, curtain wall or railing (window, balcony or terrace) on a residential building.

Right to the 50 integration bonus c € / kWh.

If buildings providing protection for people, animals, property or activities
+ The building is closed on all sides and covered
+ The photovoltaic system is installed at least 2 years after the completion date of the building.
+ The photovoltaic system is installed in the plane of the roof.
+ The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.
+ After installation, the disassembly of the photovoltaic module or the photovoltaic film can not be done without damaging the sealing function provided by the photovoltaic system or making the building unfit for use.
+ • For photovoltaic systems composed of rigid modules, the modules constitute
the main sealing element of the system.
• For photovoltaic systems composed of flexible films, assembly is done at the factory
or on site. On-site assembly is carried out under a single works contract.

ou

If buildings providing protection for people, animals, property or activities
+ The photovoltaic system is installed at least 2 years after the completion date of the building.
+ The photovoltaic system which consists of rigid modules
+ The producer makes the complete request for connection to the public network in accordance with article 2 of this decree before the 1er January 2011 is eligible for the building integration premium
+ The photovoltaic system is installed on the roof of a closed building (on all sides
lateral) and covered, ensuring the protection of persons, animals, property or activities.
+ The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.
+ The installation is parallel to the roof plan.

or even

If the installation acts as a light, cladding, sunshade, curtain wall or railing (window, balcony or terrace), on buildings of education or health.

"Simplified" integration bonus 42 c € / kWh.

If the photovoltaic system is installed on the roof of a building providing protection for
people, animals, property or activities
+ It is parallel to the plane of the roof.
+ The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.
+ The total peak power of the installation as defined in Article 2 of this Order is
greater than 3 kilowatts peak.

ou

From the January 1er 2011er, installations with a peak power less than or equal to 3 kilowatts peak (except buildings with main residential use) if only one of the following conditions is met:

- The photovoltaic system is installed on the roof of an enclosed building (on all sides) and covered, ensuring the protection of people, animals, property or activities.
- The photovoltaic system is installed at least 2 years after the completion date of the building.
- The photovoltaic system is installed in the plane of the roof.
- The photovoltaic system replaces elements of the building that provide the enclosed and covered, and
ensures the sealing function.

or even

If the installation is at least a lightening or siding or sunshade or curtain wall or railing (window, balcony or terrace)
on a building providing protection for people, animals, property or activities.


Basic bonus 35.168 c € / kWh. (with Yonne R value)

For other installations (solar farms etc)

- in Corsica, in the overseas departments and in the territorial collectivity of Saint-Pierre-et-Miquelon and Mayotte: 40 c € / kWh

- in mainland France:
31,4 c € / kWh * R
with the value of R equal to 1 for installations with a peak power less than or equal to 250 kilowatts peak, and for installations with a peak power greater than 250 kilowatts peak, the value of R is as follows:

Ain 1 Rhône-Alpes 1,09
Aisne 2 Picardy 1,15
Allier 3 Auvergne 1,09
Alpes de Haute Provence 4 Provence-Alpes-Cote d'Azur 1,00
Hautes-Alpes 5 Provence-Alpes-Cote d'Azur 1,00
Alpes-Maritimes 6 Provence-French Riviera 1,00
Ardèche 7 Rhône-Alpes 1,03
Ardennes 8 Champagne-Ardenne 1,16
Ariège 9 Midi-Pyrenees 1,05
Aube 10 Champagne-Ardenne 1,13
Aude 11 Languedoc-Roussillon 1,03
Aveyron 12 Midi-Pyrenees 1,02
Bouches-du-Rhone 13 Provence-Alpes-Cote d'Azur 1,00
Calvados 14 Lower Normandy 1,17
Cantal 15 Auvergne 1,08
Charente 16 Poitou-Charentes 1,08
Charente Maritime 17 Poitou-Charentes 1,05
Dear 18 1,09 Center
Corrèze 19 Limousin 1,07
Côte-d'Or 21 Burgundy 1,13
Côtes d'Armor 22 Brittany 1,18
Hollow 23 Limousin 1,09
Dordogne 24 Aquitaine 1,06
Doubs 25 Franche-Comté 1,13
Drôme 26 Rhône-Alpes 1,01
Eure 27 Upper Normandy 1,15
Eure-et-Loir 28 Center 1,12
Finistère 29 Brittany 1,15
Gard 30 Languedoc-Roussillon 1,00
Haute-Garonne 31 Midi-Pyrenees 1,05
Gers 32 Midi-Pyrenees 1,04
Gironde 33 Aquitaine 1,05
Hérault 34 Languedoc-Roussillon 1,00
Ille-et-Vilaine 35 Brittany 1,13
Indre 36 Center 1,06
Indre-et-Loire 37 Center 1,10
Isere 38 Rhône-Alpes 1,06
Jura 39 Franche-Comté 1,10
Landes 40 Aquitaine 1,06
Loir-et-Cher 41 Center 1,11
Loire 42 Rhône-Alpes 1,09
Haute-Loire 43 Auvergne 1,08
Loire-Atlantique 44 Pays de la Loire 1,08
Loiret 45 Center 1,11
Lot 46 Midi-Pyrenees 1,05
Lot-et-Garonne 47 Aquitaine 1,04
Lozère 48 Languedoc-Roussillon 1,05
Maine-et-Loire 49 Pays de la Loire 1,10
Channel 50 Lower Normandy 1,17
Marne 51 Champagne-Ardenne 1,13
Haute-Marne 52 Champagne-Ardenne 1,11
Mayenne 53 Pays de la Loire 1,12
Meurthe-and-Moselle 54 Lorraine 1,18
Meuse 55 Lorraine 1,20
Morbihan 56 Brittany 1,11
Moselle 57 Lorraine 1,19
Nièvre 58 Burgundy 1,12
North 59 Nord-Pas-de-Calais 1,20
Oise 60 Picardie 1,16
Orne 61 Lower Normandy 1,14
Pas-de-Calais 62 Nord-Pas-de-Calais 1,20
Puy-de-Dome 63 Auvergne 1,09
Pyrenees-Atlantiques 64 Aquitaine 1,08
Hautes-Pyrenees 65 Midi-Pyrenees 1,08
Eastern Pyrenees 66 Languedoc-Roussillon 1,03
Bas-Rhin 67 Alsace 1,14
Haut-Rhin 68 Alsace 1,13
Rhône 69 Rhône-Alpes 1,08
Haute-Saone 70 Franche-Comté 1,12
Saône-et-Loire 71 Burgundy 1,09
Sarthe 72 Pays de la Loire 1,11
Savoie 73 Rhône-Alpes 1,08
Haute-Savoie 74 Rhone-Alpes 1,08
Paris 75 Ile-de-France 1,14
Seine-Maritime 76 Upper Normandy 1,19
Seine-et-Marne 77 Ile-de-France 1,13
Yvelines 78 Ile-de-France 1,14
Two-Sevres 79 Poitou-Charentes 1,08
Sum 80 Picardy 1,20
Tarn 81 Midi-Pyrenees 1,03
Tarn-and-Garonne 82 Midi-Pyrenees 1,03
Var 83 Provence-Alpes-Cote d'Azur 1,00
Vaucluse 84 Provence-Alpes-Cote d'Azur 1,00
Vendée 85 Pays de la Loire 1,06
Vienna 86 Poitou-Charentes 1,09
Haute-Vienne 87 Limousin 1,09
Vosges 88 Lorraine 1,15
Yonne 89 Burgundy 1,12
Territoire-de-Belfort 90 Franche-Comté 1,12
Essonne 91 Ile-de-France 1,12
Hauts-de-Seine 92 Ile-de-France 1,14
Seine-Saint-Denis 93 Ile-de-France 1,14
Val-de-Marne 94 Ile-de-France 1,14
Val-d'Oise 95 Ile-de-France 1,14

Dégressivity of contract rates signed from 2012

For complete applications for connection to the public network filed after 31 December 2011,
bond purchase rates will be indexed to 1er January 2012, then to 1er January of each subsequent year equivalent to a reduction of 10% per annum.

New responsibilities of the building owners and installers:

The producer must provide the buyer with a certificate of honor certifying that the integration with the frame or the simplified integration to the frame have been carried out in compliance with the eligibility rules.
It shall keep at the disposal of the prefect a certificate from the installer certifying that the works executed to incorporate the photovoltaic installation into the building have been designed and constructed in such a way as to meet all the requirements to which they are subject, in particular the rules of design and implementation covered by NF DTU standards, professional rules or technical evaluations (technical opinion, technical application file, European technical approval, experimental technical assessment, Pass'Innovation, new technical inquiry), or any other rules equivalent of other member countries of the European Economic Area.
0 x
bernardd
Econologue expert
Econologue expert
posts: 2278
Registration: 12/12/09, 10:10
x 1

Re: outline of the 2010 decree




by bernardd » 19/01/10, 08:25

MartinMillot wrote:OA requests are valid until the evening of 11 01 2009, it is indicated on the decree.


I may be naive in the legal field, but a decree can not be retroactive. It is quite possible that he does not stand in the appropriate court ...
0 x
See you soon !
MartinMillot
I discovered econologic
I discovered econologic
posts: 4
Registration: 18/01/10, 23:24




by MartinMillot » 19/01/10, 10:15

exact,
so the value of the file filings goes at least until January 13 in the evening,
see even the 14 with a very good record in court.

Normally, a proof of receipt of the deposit by registered post with acknowledgment of receipt should suffice.

If anyone can prove me wrong?
0 x
Olivier202
I discovered econologic
I discovered econologic
posts: 2
Registration: 19/01/10, 12:23

Mobility Durable




by Olivier202 » 19/01/10, 12:26

Hello,

Here is an interesting site concerning sustainable mobility: mobilite-durable.org
0 x
Christophe
Moderator
Moderator
posts: 79362
Registration: 10/02/03, 14:06
Location: Greenhouse planet
x 11060




by Christophe » 19/01/10, 12:29

Olivier202, you're nice but:

a) no relation with PV
b) spam for 1er message

= : Evil:
0 x
Olivier202
I discovered econologic
I discovered econologic
posts: 2
Registration: 19/01/10, 12:23




by Olivier202 » 20/01/10, 16:32

@Christophe: Si. A lot of information about PV including this interview with Thierry Mueth, the CEO of Coruscant the first company specialized in the installation of photovoltaic power station:

http://www.youtube.com/watch?v=2MuwoiCK8JM
0 x
Christophe
Moderator
Moderator
posts: 79362
Registration: 10/02/03, 14:06
Location: Greenhouse planet
x 11060




by Christophe » 20/01/10, 16:46

And in addition you continue with your spamming messages? Apparently you did not understand the netiquette ...

Then contrary to what you think, the "guy" that you quote did not invent anything (Betterplace does not say anything to you? so it's already not the 1ere company) ...

I have a project myself solar photovoltaic charging carport, do not bother guys in suits for us (with big margins ... probably ... nothing is too expensive when it's green, is not it?)

Image
0 x
User avatar
I Citro
Econologue expert
Econologue expert
posts: 5129
Registration: 08/03/06, 13:26
Location: Bordeaux
x 11




by I Citro » 21/01/10, 16:16

: Arrow: connected since the 4 January, I am this subject with interest ... :?

However understanding nothing to its contents, I just called EDF OA (Obligation of Purchase).

They answered me that they themselves did not know how they are going to have to interpret the decree and therefore can not tell me anything about the dates that will make times regarding the redemption price of my production.
: Shock: :frown:

Normally, it is the date of request of OA which is authentic for the feed-in tariff (that is October 2009 in my case), but this decree comes to shake everything, in particular because its writing is very imprecise on the modes of application. ..

In addition, I have no documents from EDF OA who are not yet informed of my connection by ERDF. According to them, it can still take a few weeks ...

EDF OA just informed me that I would receive my contract in the 5 to 6 months following my connection ...
0 x
User avatar
Did67
Moderator
Moderator
posts: 20362
Registration: 20/01/08, 16:34
Location: Alsace
x 8685




by Did67 » 21/01/10, 17:53

More and more, I live here things that I had seen only in republics which one agreed to say that they had difficulty to be a State of right !!!

It is appalling. We proclaim loud and clear that we want to develop the VP and that we are going to put money into it. For once it works (even if I hear Christophe's arguments on sustainability and large-scale reproducibility), well, we talk about a "bubble", we slow down, we change the rules during the game ... Appalling. I have no other words. We do not hear it, moreover, Borloo !!!

PS: that said, I'm happy; I do not know where, on this forum, I wrote in October or November that it was necessary to hurry, that surely that would not last - whereas one wondered to know "if it was profitable" [sic] !!!
0 x

 


  • Similar topics
    Replies
    views
    Last message

Back to "Renewable energy: solar electricity"

Who is online ?

Users browsing this forum : No registered users and 242 guests