Design of a boiler room

Heating, insulation, ventilation, VMC, cooling ... short thermal comfort. Insulation, wood energy, heat pumps but also electricity, gas or oil, VMC ... Help in choosing and implementation, problem solving, optimization, tips and tricks ...
boubka
Grand Econologue
Grand Econologue
posts: 950
Registration: 10/08/07, 17:22
x 2




by boubka » 24/05/10, 15:29

Hello
In series with valve which bypasses the boiler at rest (or PAC) is identical to in parallel (except the vocabulary)

sorry but in series c is in series and in parallel c is in parallel :?
and from two or even 3 receivers or transmitters things get seriously complicated, especially for the regul.
in addition let's stop to think only 3 or 4 way valve, even if they are very useful a lot of priority can do this with the pumps and or non return
0 x

 


  • Similar topics
    Replies
    views
    Last message

Back to "Heating, insulation, ventilation, VMC, cooling ..."

Who is online ?

Users browsing this forum : No registered users and 284 guests