Manufacturing a bucket wheel with an irrigation reel

Renewable energies except solar electric or thermal (seeforums dedicated below): wind turbines, energy from the sea, hydraulic and hydroelectricity, biomass, biogas, deep geothermal energy ...
Christophe
Moderator
Moderator
posts: 79332
Registration: 10/02/03, 14:06
Location: Greenhouse planet
x 11046




by Christophe » 17/12/09, 22:32

Well if it's at home and he asked for permissions?

400 kg and mechanical shovel, well I see that we are not playing in the same schoolyard, I go back to my sandbox... : Oops:
0 x
boubka
Grand Econologue
Grand Econologue
posts: 950
Registration: 10/08/07, 17:22
x 2




by boubka » 17/12/09, 23:47

Well if it's at home and he asked for permissions?

ok no bp if authorization, but it is much more complicated than it seems, deprives or not its water short is public (water fauna and flora does not belong to it), it is not closed water ( although ... it would be necessary that a judge decrees it). the laws of fishing are very complicated ...
the authorizations it is not obtained like that ... it is very long and it is the course of the combatant the different actors are first navigation, the fishing company, the water agency or the drire, the dde etc .. .
it would be a shame to take a fine and be forced to dismantle the work on the simple complaint of a guard, a fisherman or a jealous neighbor : Cry: (whenever he sees the project on the net)
Anyway, when you have a pond, you are aware of that ... I presume.
before speculating more on anything i will wait for the response from Fredot 24.
0 x
boubka
Grand Econologue
Grand Econologue
posts: 950
Registration: 10/08/07, 17:22
x 2




by boubka » 17/12/09, 23:59

two more Fredot 24 questions:
do you respect the passage of a meter 50 for fishermen?
your first and second category watercourse, public or private?
0 x
fredo24
I learn econologic
I learn econologic
posts: 32
Registration: 17/12/09, 17:10
Location: dordogne
x 1




by fredo24 » 18/12/09, 07:56

Oh there!!
the tailrace is on the private domain and the structure was already half existing for the dredge I will meet them next week
but as it seems that it heats up and that all these technocrats and civil servants will take a decade to decide and that I am at home operating a fish farming area, the project being already under study for quite some time, grids will be posed at the arrival of the wheel and the shape of the buckets (curves) allow the passage of a trout without killing it the installation is planned on one of my private fishing routes I have a right of water for fish farming
I don't see why at the moment he would forbid me
so I anticipate the movement a little we are not in Copenhagen here it has to move it is understood that there is no resale EDF
in case it gets stuck in the media coverage of the project but I don't think it is necessary
please
frederic : Idea:
0 x
fredo24
I learn econologic
I learn econologic
posts: 32
Registration: 17/12/09, 17:10
Location: dordogne
x 1




by fredo24 » 18/12/09, 08:00

I am fed by a weir of mill not on stream 1st cat or 2nd
fred
0 x
boubka
Grand Econologue
Grand Econologue
posts: 950
Registration: 10/08/07, 17:22
x 2




by boubka » 18/12/09, 09:12

hello Fredo 24

on one of my private fishing routes I have a water right for fish farming

operating a fish farm


ok you are in a particular case provided by the fishing law (I told you it is complicated)

I don't see why at the moment he would forbid me

me neither ... but the project must be well put together and it can take time to obtain authorization (unless you have relations with the pref)

I am fed by a weir of mill not on stream 1st cat or 2nd

therefore it does not concern navigation nor the fishing company.
on the other hand I think that it is necessary an agreement with the owner of the mill

in any case I wish you good luck for this very interesting project 8)

one last detail: you do not have the right to resell your current, except to edf

good job keep us posted :D
0 x
boubka
Grand Econologue
Grand Econologue
posts: 950
Registration: 10/08/07, 17:22
x 2




by boubka » 18/12/09, 09:17

the structure was already half existing for the dredge

I hadn't read everything right ... in this case it should be much simpler.
and I see that you take all the legal provisions, it's very good.
not everyone : Cry: but for certain it is very expensive (I have the case not far from home)
good day a +
0 x
fredo24
I learn econologic
I learn econologic
posts: 32
Registration: 17/12/09, 17:10
Location: dordogne
x 1




by fredo24 » 18/12/09, 09:28

the electricity produced is consumed by the farm directly
a photovoltaic installation is currently being quoted
170m2 facing south on 2 gite buildings and built-in agricultural bati
resale edf 27kwh planned
erdtf line 36kw already on site
and inverter on installation already installed
it is expensive but profitable in the medium term
sanyo panels and german inverter : Idea:
0 x
fredo24
I learn econologic
I learn econologic
posts: 32
Registration: 17/12/09, 17:10
Location: dordogne
x 1




by fredo24 » 18/12/09, 13:15

the mill is no longer in operation old sawmill
who can give me a hand for triangle speed calculation for the hydrodynamics of the bucket? :?:
0 x
raymon
Grand Econologue
Grand Econologue
posts: 901
Registration: 03/12/07, 19:21
Location: vaucluse
x 9




by raymon » 05/01/10, 11:26

In your photos there is no fall? On this site made by a former EDF engineer there is a lot of information and he gladly responds by email.

http://www.hydroroues.fr/
0 x

 